Annual water budget for site: Arolsen_Brache
Year,Initial water pools (cm),,,,,Input (cm/yr),,,Output (cm/yr),,,,,,,,End water pools (cm)
,Soil,Snow,Leaf,Pond,Deep,Precipitation,Irrigation,Interception,Snow evap,Leaf evap,Pond evap,Soil evap,Tranpiration,Leaching,Runoff,Soil,Snow,Leaf,Pond,Deep
  1, 13.2,  0.0,  0.0,  0.0,  0.0, 75.4,  0.0,  0.0,  0.2,  0.0,  0.0, 18.3, 23.5, 13.3,  5.3, 10.1,  0.2,  0.0,  0.0,  0.0
  2,  8.2,  0.0,  0.0,  0.0,  0.0, 58.0,  0.0,  0.0,  0.8,  0.0,  0.0, 24.1, 10.8,  6.8,  0.0, 12.8,  0.5,  0.0,  0.0,  0.0
  3, 11.9,  0.0,  0.0,  0.0,  0.0, 66.3,  0.0,  0.0,  0.1,  0.0,  0.0, 25.7, 14.6, 12.1,  0.3, 13.0,  0.0,  0.0,  0.0,  0.0
